Independent perspectives. Connected industries. Fuel · EV · Convenience · Foodservice
Operator guide / Editorial framework

South Africa: reconciling pump and till litres at shift handover

Give the incoming supervisor a record of which litres differ, what has been checked and who will follow up.

Forecourt News Editorial

South African fuel retail. Editorial worksheet for sites with pump and till volume records. Check report definitions against your own system before using it. Sources checked 19 November 2026.

What local systems can show

IntegraPOS describes linking pump pulls, shift totals, tenders and account sales. MPI lists totalizer reconciliation in its MP9000 brochure. These are documented product capabilities. Confirm which reports and units your site actually records.

IntegraPOS · Shift totals and pump transactions

MPI · MP9000 product brochure

Match the shift before comparing litres

On the worksheet, enter the site, shift start and end, product and nozzle or pump identifier used by both reports. Record the opening and closing volume readings from existing records, along with their timestamps. If the till only reports by product, add up the matching nozzles for that product. If the scopes cannot be matched, record the missing detail and leave the difference open.

Work an example

Illustrative figures for one nozzle. An opening reading of 12,400 L and a closing reading of 13,060 L give 660 L dispensed. The till shows 640 L for the same nozzle and shift. Record +20 L using pump volume minus till volume. Keep cash, card and account amounts in rand on a separate payment check.

Hand over the open item

Check the final pump and till transactions either side of the shift cutoff. If a later receipt accounts for 20 L, record its reference and time and check that the next shift will count it once. Without matching evidence, keep the original +20 L open. Give it an owner and a follow-up time. A volume difference alone does not establish its cause.

Tip to test on the next shift

Ask the incoming supervisor to trace one open item using only the sheet and referenced reports. Record which field they needed to ask about, then add it to your local copy.

Take the checklist to your next review

  • Shift start / end and report references
  • Product / nozzle or matching group of nozzles
  • Opening and closing pump totals (L) and times
  • Dispensed (L) / till (L) / signed difference (L)
  • Exception and supporting transaction reference
  • Handed over by / received by / follow-up owner and time
Download the checklist (PDF) ↓

Original references

IntegraPOS · Shift totals and pump transactions ↗MPI · MP9000 product brochure ↗